ECOW - Bridge Rehabilitation
ECoW - Bridge Rehabilitation Project

AVRIO have recently completed ECoW as part of a bridge rehabilitation scheme in the west of Ireland.
Construction works undertaken entailed development of a new concrete apron slab across the full width of the river downstream, a concrete toe beam constructed upstream and the laying of new rock armour placed in the river bed upstream and downstream of the bridge. A damaged section of stone masonry river retaining wall was additionally removed and replaced with reinforced concrete retaining walls.
ECoW works included:
- Pollution prevention
- Sediment management
- Monitoring of instream works
- Invasive species management
For more information on these services, contact us via email at info@avrio-env.com or call us at 02866335608.


